Payment Type:L/C,T/T,D/P,D/A,Paypal
Incoterm:FOB,CFR,CIF,EXW,DDP,DDU
Min. Order:1 Ton
Transportation:Ocean,Land,Air,Express
Port: Qingdao,Tianjin,Shanghai
Standard: Aisi, Astm, Gb, Jis, Bs, Din
Place Of Origin: China
Production Process: Cold Drawn
Tolerance: ±1%
Processing Service: Punching, Cutting, Bending, Decoiling, Welding
Packaging: Standard seaworthy packing
Transportation: Ocean,Land,Air,Express
Supply Ability: 50k tons per month
Port: Qingdao,Tianjin,Shanghai
Payment Type: L/C,T/T,D/P,D/A,Paypal
Incoterm: FOB,CFR,CIF,EXW,DDP,DDU
Pressure vessel Steel Plate covers carbon steel and alloy steel grades, which are designed for use in making pressure vessels, boilers, heat exchangers and any other vessels and tanks that to store liquid or gas at high pressures. It includes applications like below or similar:
· Crude Oil Storage Tanks
· Natural Gas Storage Tanks
· Chemicals and Liquid Storage Tanks
· Firewater Tanks
· Diesel Storage Tanks
· Gas Cylinders for Welding
· Gas Cylinders for Cooking in peoples daily life
· Oxygen Cylinders for Diving
Pressure Vessel Steel Grades have four of varying strength:55, 60, 65 and 70, and range of thinkness is from 1-500mm, material is carbon
steel and alloy steel, and S235JR is a common Pressure Vessel Plate Material.
Product decription
Product name DIN 25CrMo4 high strength low alloy structural steel price per ton Standard ASTM A516/A515,ASME SA516/SA515,etc. Material GR55,GR60,GR65,GR70 Q245R,Q345R,Q370R Dimension thickness : 1-500mm width: 300-3000mm length : 1000~12000mm or as request Application It is mainly used in tool steel, cementation steel and bearing steel.Like reactor, heat exchanger, separator, spherical tank, liquefied gas tank, nuclear reactor pressure vessel, boiler steam drum, liquefied gas cylinders, hydropower station high pressure hose, spiral case and other equipment and components. Technique Hot-rolled, controlled rolling, normalizing or as required Surface Mill Finished or as per required Certification: BV, ISO, CE Payment terms T/T , L/C, West union and Other Delivery time 15-20 days after your deposit and depend on quantity Remarks Upon the final quantity you demand MTC will be handed on with shipping documents We accept the third party certification test
15CrMoR,15MnNiDR,15Mo3,15CrMoG
09MnNiDR,12MnNiVR,13MnNiMoR,Gr70,18MnMoNbR,19Mn6
12Cr2Mo1R,12Cr1MoVR,12CrMo1R,14Cr1MoR